FAQs

QuestionResponse
How long is construction anticipated to take? Construction of this project is anticipated to take 4 years.
What is the purpose of the Study? Read more
What is the Study Area? Read More
When will construction of the project begin? Construction is scheduled to commence in spring of 2021 and is expected to be complete by 2024.
Where can I review the Preliminary Design Documentation? Highway 400 Improvements from 1 km South of Highway 89 to the Junction at Highway 11 /
Will the Innisfil Beach bridge be the same size and on the same alignment?The new bridge is anticipated to be wider and on the same alignment as existing.
Will traffic and pedestrians have access to the bridge during construction?Full closure (i.e., including traffic and pedestrian use) of Innisfil Beach Road will be required for 4-6 weeks to complete interim grade lowering. Some turning movements, including E-S and W-N, will be restricted due to the closures. Signed detours will be provided. Full closure of the S-E/W ramp will be required for a period of 2-3 weeks to facilitate the construction of a new S-E/W ramp. Signed detours will be provided.

Detour routes are currently under discussion for expected closures.