Question | Response |
---|---|
How long is construction anticipated to take? | Construction of this project is anticipated to take 4 years. |
What is the purpose of the Study? | Read more |
What is the Study Area? | Read More |
When will construction of the project begin? | Construction is scheduled to commence in spring of 2021 and is expected to be complete by 2024. |
Where can I review the Preliminary Design Documentation? | Highway 400 Improvements from 1 km South of Highway 89 to the Junction at Highway 11 / |
Will the Innisfil Beach bridge be the same size and on the same alignment? | The new bridge is anticipated to be wider and on the same alignment as existing. |
Will traffic and pedestrians have access to the bridge during construction? | Full closure (i.e., including traffic and pedestrian use) of Innisfil Beach Road will be required for 4-6 weeks to complete interim grade lowering. Some turning movements, including E-S and W-N, will be restricted due to the closures. Signed detours will be provided. Full closure of the S-E/W ramp will be required for a period of 2-3 weeks to facilitate the construction of a new S-E/W ramp. Signed detours will be provided. Detour routes are currently under discussion for expected closures. |